Boathouse with lifts, fall 2025
From pile driving on September 20 to boat lifts on October 14, 2025: upper bands, rafters, shingles, a storage room and composite decking in between.
Lake Gaston

The build, as it was posted
Dates and quotes come from the Twin Lakes job posts. Customer names are left out.
-
Sep 20, 2025 (frame from the job video)
Piles driven
“Driving piles at the job site.”
The barge and driving rig on an overcast September day.
-
Sep 24, 2025
Upper bands
“Installing upper bands at the job site.”
Bands and bracing go on top of the posts, with the walkway to shore already built.
-
Sep 27, 2025
Rafters
“Rafter installation at the jobsite.”
The roof frame reflected in calm water.
-
Oct 2, 2025
Roof framing
Rafters and ceiling boards from inside the slip.
Posted without a caption.
-
Oct 9, 2025
Roof shingles
“Roof shingles installed. Great job by Earl Braddy and his crew.”
Shingled roof over the slips.
-
Oct 12, 2025
Storage room
A sided storage room with a door, on grey composite decking.
Posted without a caption.
-
Oct 14, 2025
Boat lifts
“Boatlifts are installed. Ready for electrical.”
Lift cradles hang in the slip under the finished roof.