From pile driving on September 20 to boat lifts on October 14, 2025: upper bands, rafters, shingles, a storage room and composite decking in between.

Lake Gaston

Boathouse with lifts, fall 2025

The build, as it was posted

Dates and quotes come from the Twin Lakes job posts. Customer names are left out.

  1. Sep 20, 2025 (frame from the job video)

    Piles driven

    “Driving piles at the job site.”

    The barge and driving rig on an overcast September day.

  2. Sep 24, 2025

    Upper bands

    “Installing upper bands at the job site.”

    Bands and bracing go on top of the posts, with the walkway to shore already built.

  3. Sep 27, 2025

    Rafters

    “Rafter installation at the jobsite.”

    The roof frame reflected in calm water.

  4. Oct 2, 2025

    Roof framing

    Rafters and ceiling boards from inside the slip.

    Posted without a caption.

  5. Oct 9, 2025

    Roof shingles

    “Roof shingles installed. Great job by Earl Braddy and his crew.”

    Shingled roof over the slips.

  6. Oct 12, 2025

    Storage room

    A sided storage room with a door, on grey composite decking.

    Posted without a caption.

  7. Oct 14, 2025

    Boat lifts

    “Boatlifts are installed. Ready for electrical.”

    Lift cradles hang in the slip under the finished roof.

Next build: Sundeck boathouse on Vincent Circle

Tell Burwell what you want on your shoreline.

Slip size, roof height, a room, a sundeck, a lift. Call, or send the details and we will get back to you.